    摘要:

    在銅綠山礦井下殘留礦柱回采中,采用超前拉槽压憋、分次落礦、梯段式推進(jìn)等新穎獨特的采礦工藝技術(shù),圓滿(mǎn)地解決了殘礦回收過(guò)程中技術(shù)與經(jīng)濟難于統一的問(wèn)題,取得了良好的技術(shù)效果和顯著(zhù)的經(jīng)濟效益。該項技術(shù)具有很高的借鑒價(jià)值和廣闊的推廣應用前景。

    Abstract:

    In the exploitation of underground residual pillars at T onglushan Mine,some noval and unique mining techniques such as advance cutting ,sequential slice-caving and bench-pushing forward etc. were used to solve the p roblem of technique and economy unification satisfactorily in the process of re sidual pillars recovery.Some good technical effect and obvious economic benefit were achieved.This technology is possessed of better referential value and wide application prospect.

    參考文獻
    相似文獻
    引證文獻
引用本文

楊明.殘留礦柱開(kāi)采的新工藝技術(shù)研究[J].礦業(yè)研究與開(kāi)發(fā),2000,(6):8-10

復制
分享
文章指標
  • 點(diǎn)擊次數:
  • 下載次數:
  • HTML閱讀次數:
  • 引用次數:
歷史
  • 收稿日期:
  • 最后修改日期:
  • 錄用日期:
  • 在線(xiàn)發(fā)布日期:
  • 出版日期: